Al-Alamein International Airport / 2022- 2025

Al-Alamein International Airport / 2022- 2025

  • Construction of Al-Alamein Fuel Depot- Al-Alamein International Airport / 2022 -2025

 (El-Nil-EGYPT GAS)

  • JET-A1 Tank of Capacity 1200 m3 - Over Filling Protection System.                
  • JET-A1 Ground Fueling System. All Electrical Works & Cables.
  • Reception and Loading Stations. JET-A1 Filtration/Separation Systems.
  • JET-A1 Pumping Stations.Water Tank Capacity 1200 m3
  • JET-A1 Flow Metering Systems.Automatic Tanks Gauging System.
  • Cathodic Protection System. Automatic Control System.
  • Emergency Shut Down System.Steel Structure works.
  • Leak Detection System. Diesel Generator.
  • CCTV System - Fire Fighting / Alarm Systems (Water & Gas).