Our Projects

Projects

List of companies:-


  • 1. Misr Petroleum Co.
  • 2. Petroleum Arrows Co.
  • 3. CAC (Cairo Airport Company).
  • 4. Egypt Gas.
  • 5. Petromaint.
  • 6. Chevron Texaco.
  • 6. Chevron Texaco.
  • 8. Petrogas.
  • 9. Gasco.
  • 10. Ekin.
  • 11. EL-Nour Co.
  • 12. AL Marasem Int’l for Development.
  • 13. Saudi Bin Laden Group
  • 14. Limak inşaat

Airports Projects.............................

Fuel Station for a Military Airport in Khashm Alan, Riyadh New fuel Hydrant System Cairo Airport (TB2). Hurghada Airport Jet Fuel Hydrant System Upgrade Main Jet Fuel Station for Sharm El-Sheikh Airport and connect it with the existing system Upgrading of Aircrafts Main Fuelling Station for Hurghada Airport and connect it with the existing s Construction of Aircrafts Main Fuelling Depot for TABA Airport Re-fuelling Units Aircraft New Fuelling Depot for Abuja Airport New Aircraft Fuelling Depot for Hurghada Airport

 Client                  : Nesma & Partners Contracting Co. Ltd

Project Value   : SAR 5,986,000

Site                      : Khashm Alan – Riyadh- SA.

Scope of work : Design, Supply, Erection and  Commissioning of Mechanical & Electrical Installation Works for Jet A1 & JP8 fuel station :

(4) Underground double skin storage tanks 110 m3 completed with all accessories as per UL certificate (Al-Majd  Manufacture ).
Pumps and filters station (8 API pump& 4 FWS)
  Cathodic Protection System based on deep well.   

• Emergency System

Leak Detection System.
Instrumentation system 

Loading & Unloading stations with hoses and couplings.

Earthling System for the whole station.
Aboveground stainless steel recovery tanks with float switches
Sampling system connected with the recovery tanks

Start                 : October 2014

Status                 : Under Construction.



 Project Name   : New fuel Hydrant System Cairo Airport (TB2).

Client                  : Limak Inşaat

Project Value   : EGP 112,669,000

Site                      Cairo International Airport - Egypt.

Scope of work : Design, Supply, Erection and  Commissioning of:

Hydrant 24” and 14” dim. Pipe lines
  Cathodic Protection System   

• Emergency System

Leak Detection System.
Instrumentation and SCADA system 

• Civil works.

Supply, install and commissioning for Pit box, Isolating Valve and          Hydrant pit valve.
Hot Tapping and Blocking

Start                 : January 2013

Status                 : Under Construction



 Project Name  : Hurghada Airport Jet Fuel Hydrant System

Client               : Saudi Bin Laden Group

Project Value   : $ 13,160,000

Site                   : Hurghada Airport - Egypt.

Scope of work : Design, Supply, Erection and Commissioning of:

Hydrant 14” and 6” dim. Pipe lines
Cathodic protection system   

• Emergency System.

Instrumentation and SCADA system.
Leak Detection System. 

• Civil works.

Supply, install and commissioning for Pit box, Isolating Valve and Hydrant pit valve.

Start                    : January 2011

Status                 : Under Construction



 Project Name : Upgrade Main Jet Fuel Station for Sharm El-Sheikh                 Airport and connect it with the existing system.

Client               : Misr Petroleum Co.

Project Value   : EGP 5,024,933

Site                   : Sharm El-Sheikh Airport - Red Sea - Egypt.

Scope of work  : Design, Supply, Erection and Commissioning of:

JET-A1 Tank of capacity 2500 m3
Pipe line network                                 
Mechanical Installations
New Cathodic protection system

• Upgrade the control instrumentation system and connect it with the  old control system.

• Upgrade the firefighting system

The related Civil Work for Depot Buildings

Start                 : 2009

Status                : Handed over on 2010.



 Project Name : Upgrading of Aircrafts Main Fuelling Station

  for Hurghada  Airport and connect it with the existing 

  system.

Client              : Misr Petroleum Co.

Project Value : EGP 2,674,675

Site                 : Hurghada Airport - Red Sea - Egypt.

Scope of work   : Design, Supply, Erection and Commissioning of:

JET-A1 Tank of capacity 2500 m3
Pipe line network                               
Mechanical Installations
Upgrade the cathodic protection system and connect it to the old system

• Upgrade the control instrumentation system and connect it with the old

   control system.

• Upgrade the firefighting system

The related Civil Work for Depot Buildings

Start                   : 2008

Status                : Handed over on 2009



 Project Name : Construction of Aircrafts Main Fuelling Depot

     for TABA  Airport.

Client              : Misr Petroleum Co.

Project Value  : EGP 4,624,317

Site                  : Taba Airport – Sinai - Egypt.

Scope of work    : Design, Supply, Erection and Commissioning of:

JET-A Pumping Stations.              • JET-A Filtration/Separation System.
Control System.  • Plumping System.
Mechanical installations.               • Fire fighting works.
Fire Alarm system                         • HVAC system.
Civil Work for Depot Buildings.     • Electrical Installation Works.

Start                   :2008

Status                : Handed over on 2009



 Project Name : Re-fuelling Units

Client              : Misr Petroleum Co.

Project Value : EGP 908,240

Site                 : AL-MAJD Workshop - Egypt.

Scope of work   : Design, Supply, Erection and Commissioning of:

JET-A Pumping Units.                 
JET-A Filtration/Separation System.
Steel Structure chassis.             
Pipes and fittings arrangements.

Start                   : 2009

Status                : Handed over on 2009.



 Project Name   : Aircraft New Fuelling Depot for  Abuja Airport.

Client                : Chevron Texaco.

Project Value   : $ 1,500,000

Site                   : ABUJA  Airport - Nigeria.

Scope of work     : Design, Supply, Erection and  Commissioning of:

Depot of 2250 m3 Storage Capacity.   • Automatic Control Systems.
Reception and Loading Stations.        • All Electrical Works & Cables.
JET-A Pumping Stations.                    • Over Filling Protection System.
JET-A Filtration/Separation Systems.  • Emergency Shut Down System.
JET-A Flow Metering Systems.           • All Civil Works for Erection.
Reception and Loading Shads            • Test Rig Erection
Depot Firefighting System.                  • Design, Fabrication and Erection 
All Instruments & Cables for Depot     • Lightening System
Tanks Gauging System.

Start                      : 2007

Status                   : Handed over on 2008.



 Project Name : New Aircraft Fuelling Depot for Hurghada  Airport.

Client              : PETROMAINT

Project Value  : EGP 16,500,000

Site                  : Hurghada Airport - Egypt.

Scope of work    :  Design, Procurement, Erection and  Commissioning of:

7500 m3 Storage Capacity Tank.     • Hydrant 14” dim. 2x2200 m.
Reception and Loading Stations.     • JET-A Filtration/Separation Systems
JET-A Pumping Stations.                 • Lightening System
JET-A Flow Metering Systems.        • Automatic Tanks Gauging System
Cathodic Protection System.            • Automatic Control Systems
All Instruments & Cables for Depot  • Emergency Shut Down System.
All Electrical Works & Cables.          • Plumping System
Over Filling Protection System.        • Fire Fighting System.
JET-A Ground Fuelling Systems.      • Test Rig
All Civil Works      • Building  and Fences.

Start                     : 1999

Status                   : Handed Over on 2001.  



Militry projects.............................

Construction of Pipe line network for Wady qena Military Airport - Qena Re-fuelling Units Hurghada Military Airport KAF

 Project Name : Construction of Pipe line network

      for Wady qena Military  Airport - Qena  .

 

Client              : Co-operation Petroleum. 

 

Project Value :  EGP 8,650,000

 

Site                 : Qena -Egypt.

 

Scope of work   :

 

Installation of pipeline network  8” diam.8300 m.

 

Installation of internal network for sending and receiving Jet A1.

 

Filtration and pump station.

 

Status                 :  Handed Over on 2006.



 Project Name : Re-fuelling Units

 

Client              : Avifil.

 

Project Value : USD 200,240

 

Site                 : Djibouti Air force station- Djibouti.

 

Scope of work   : Design, Supply of:

JET-A1 Pumping Units.                 
JET-A1 Filtration/Separation System.
Steel Structure chassis.             
Pipes and fittings arrangements.

 

Start                   : January 2011

 

Status                : Handed over on December 2011.



 Project Name : Hurghada Military Airport

 

Client              : Co-operation Petroleum. 

 

Project Value :  EGP 600,000

 

Site                 : Hurghada -Egypt.

 

Scope of work:

 

   Upgrade filtration and pump station

 

Status                 :  Handed Over on 2009.  



 Project Name : KAF

 

Client              : Supreme Fuels Trading FZE - Dubai. 

 

Project Value :  USD 538,265

 

Site                 : United  Arab Emirates .

 

Scope of work:

 

   Installation of pipeline network

 

Status                 :  Handed Over on 2010



General Projects.............................

Administration building, workshop and store construction Pressure reduction and adding odor station Pressure reduction and adding odor station Main Building and Workshop Revamp of Butane Gas Bottles’ filling Station. Revamp of Butane Gas Bottles’ filling Station Chillers Plant & HVAC Network Pyramids Smart Village Administrative building and control room (Esh El–Malaha Company)- Hurghada City. Administrative building and control room (Esh El–Malaha Company)- Hurghada City.

 Project Name: Administration building, workshop and store construction

Client                 : Al-Majd Warner Lewis Company.

Project Value    : EGP 3,000,000

 Site                     : Third destination, Cairo – Egypt.

Scope of work  : Construction, Erection and Fabrication of:

•  Main Administration building.

•  Workshop building.

•  Store building.

HVAC System.
Firefighting system                 • Fire Alarm System
Plumbing System.

•  All Electrical works and Cables. 

•The General Layout works.

Status                : Under Construction



 Project Name: Pressure reduction and adding odor station

Client             : Overseas Co.

Project Value : EGP 4,123,141

Site                 : Al-Waraq City – Egypt.

Scope of work   :

Construction, Erection and Fabrication of:

•  Main Administration Building.

•  Security Room.

•  Water Tank.                              Plumping System

•  Freighting System.                  • Control System

   Air conditioning system.        Fire Alarm system   

•  All Electrical works and Cables    

•   The Main Fence.    

•   The General Layout works.

Status     : Handed over on 2011.



 Project Name     : Pressure reduction and adding odor station

Client                   : Trans Gas Co.

Project Value      : EGP 3,870,251

Site                       : Desouq City – Egypt.

Scope of work    : Construction, Erection and Fabrication of:

•  Main Administration Building.        •  Security Room.

•  Water Tank.                                      •  Fire fighting System

  Control System                                •  Plumping System

•  All Electrical works and Cables      •  Air conditioningSystem

•   The General Layout works.            •   The Main Fence.

Fire Alarm System.

 

Status                  : Handed over on 2011.



 Project Name : Main Building and Workshop.

Client              : Petroleum Arrows Co.

Project Value : EGP 13,994,000

Site                 : Al Max – Alexandria – Egypt.

Scope of work   :

 Design, Erection and Commissioning of:

Main Workshop Building.                 • Store Building.
Steel Structure complete with the overhead crane.
Water Tank of capacity 900 m3
Fire fighting System                       • Plumping System.
Air conditioning System.
Electrical works and Cables

• All relative Civil works.

Status                : Handed over on 2011



 Project Name : Revamp of Butane Gas Bottles’ filling Station.

Client              : Petrogas.

Project Value :  EGP1,660,000

Site                 : Mostorod - Egypt.

Scope of work  :

 Design, Procurements, Erection and Commissioning of:

Mechanical Installation (Steel works, piping &

   equipments)

Firefighting and Fire Alarm.
Installation works of Instruments & Cables.
Installation works of Electrical & Cables

Status                : Handed Over on 2007.



 Project Name : Revamp of Butane Gas Bottles’ filling Station.

Client              : Petrogas.

Project Value :  EGP1,660,000

Site                 : Mostorod - Egypt.

Scope of work  :

 Design, Procurements, Erection and Commissioning of:

Mechanical Installation (Steel works, piping &

   equipments)

Firefighting and Fire Alarm.
Installation works of Instruments & Cables.
Installation works of Electrical & Cables

Status                : Handed Over on 2007.



 Project Name  : Chillers Plant & HVAC Network

                  Pyramids Smart Village.

Client               : Egypt Gas.

Project Value  : EGP 6,510,295

Site                  : Smart Village - Cairo - Egypt.

Scope of work    : Erection and  Installations of:

Mechanical Installation for HVAC system
Refrigeration and Air Conditioning Network Pipe line.
Mechanical Installation of Equipment Includes:
Cooling Tower.     Chiller’s.
Pump.     Compressor.
Civil works                   Control works 

Status                 : Handed Over on 2005.



 Project Name : Administrative building and control room

  (Esh El – Malaha Company) - Hurghada City.

Client              : Eshpetco.

Project Value : EGP 6,303,004

Site                 :  Hurghada - Egypt.

Scope of work  : Design, Procurements, Erection and Commissioning of:

All Civil Works for Erection.
  Lighting System.
Plumping System.
Firefighting system
HVAC system
Cathodic Protection System.
Automatic Control System and Control Room.

Status                : Handed Over on 2006.



 Project Name : Administrative building and control room

  (Esh El – Malaha Company) - Hurghada City.

Client              : Eshpetco.

Project Value : EGP 6,303,004

Site                 :  Hurghada - Egypt.

Scope of work  : Design, Procurements, Erection and Commissioning of:

All Civil Works for Erection.
  Lighting System.
Plumping System.
Firefighting system
HVAC system
Cathodic Protection System.
Automatic Control System and Control Room.

Status                : Handed Over on 2006.